On/Off Schedules with addition of smrt button override ?
Hi.
I am researching Tapo capabilities to cover a specific scenario. Can you please give me an insight if the following is possible:
1. I would like to create on/off schedules on a smart socket P110 or P115, I suppose this is doable without problems.
2. I would like to use a smart button S200B to power on/off the same smart socket as above, overriding the schedule. The schedule should be active when the button is in the "off" state.
3. Additionally I would like to use a smart button S200B to set the "on" duration of the smart socket by turning the button. Each "turn click" should add 30 minutes to the "on" duration.
Looking forward to your insights and suggestions. If further clarification is possible, let me know. If all 3 points are not possible, let me know which parts of that would be possible.
Thanks !