upgrade schedule
Hi, We have the Omada Software Controller 5.12.7 and want to setup the upgrade schedule (Setup-Services-Upgrade schedule). I can upgrade all switches and AP's at the same time but is Omada Software clever enough to not upgrade the PoE switch while the AP's are upgrading? Because when the PoE switch is restarting the AP's, which are also upgrading, will loose power.
Or do i have to make several schedules, one for the PoE switch and 15 minutes later one for the AP's etc.?
We have about 30 schools so it's quit a difference if we have to make 1 schedule a school or 3 schedules.
Thanks.